RFQ for kitchen and bathroom upgrades at two locations in Kubin, Torres Strait. Lump sum price breakdown required; non-conforming if incomplete. Evaluation based on best value for money with criteria including local content (15%), price (45%), quality (15%), WHS (10%), and schedule (15%). Payment within 30 days of valid invoice. Defect liability 12 months. Public liability insurance $20M required. Site access permits and land council permissions required. Quotation validity 90 days.
Quotations close on 19th November 2026 at 2pm. The expected decision date is 17th February 2027. close date: 19th november 2026 @2pm
Payment is made within 30 days of receiving a valid tax invoice. the contractor will be paid by tsirc within 30 days of receiving a valid tax invoice
The contractor warrants the works are free from defects, comply with standards, and are fit for purpose. the contractor warrants that, when title of the works passes to tsirc, the works will: be free from any charge, liability or defect
The award is based on best value for money, assessing price and non-price criteria together. the engagement of services shall be awarded to the respondent who best demonstrates the ability to provide best value for money
All work must be carried out by experienced and licensed personnel. all work must be carried out by experienced and licensed personnel in the field of work specified
If works are not completed within the requested timeframe, TSIRC may remove the work order and undertake work by other means. if works are not completed within the requested timeframe, tsirc nominated representatives have the authority to remove the system work order
If the quotation form and response schedules are not completed, the RFQ will be classed as non-conforming. if the quotation form and response schedules are not completed the rfq will be classed as non- conforming