Design and construct trunk infrastructure and a new storage shed for the Cherbourg Materials Recovery Facility upgrade. Contract **** design and construct. Practical completion within 100 calendar days after tender acceptance. Security: two bank guarantees at 5% of contract sum. Liquidated damages $500 per day. Defects liability period 12 months. Public liability insurance minimum $20,000,000. Professional indemnity insurance $2,000,000 per claim. Tender closes 17 November 2026.
Practical completion is required within 100 calendar days after the date of acceptance of tender, as stated: period of time for practical completion clause 1 within 100 calendar days after the date of acceptance of tender.
Progress claims are due on the 21st day of each month for work done to that date, as stated: times for progress claims 21st day of each month in which wuc is carried out up to and including the month in which practical completion is reached.
The contractor warrants that all plant, equipment, materials and goods supplied will be new, free from defects and of merchantable quality, as stated: be free from defects and of merchantable quality.
The contractor must be suitably qualified and experienced, as stated: at all times be suitably qualified, skilled and experienced and hold, maintain and comply with the requirements of, all necessary competencies, licences, accreditations, qualifications, permits, clearances or other authorisations.
Liquidated damages are set at $500 per day, as stated: liquidated damages, rate subclause 34. 7 500 per day.
Engaging in improper conduct, including collusive tendering or attempting to improperly influence, is prohibited, as stated: engaging in any collusive tendering, anticompetitive conduct, or any other unlawful or unethical conduct.