Muswellbrook Shire Council invites quotations for constructing a new DN100 PN16 PVC-M water main in Foley Lane. The works include supply, installation, testing, commissioning, and reinstatement of approximately 110 metres of water main and associated components. Quotations must be lodged via the GoToMarket platform by September 2, 2026. The contract is a lump sum contract. Compliance with WSAA Water Supply Code of Australia is required.
The quotation closing date is September 2, 2026, at 2pm. quotation closing 2 september 2026 date quotation closing 2pm
Payment milestones are proposed as: 20% for preliminaries/supply, 30% for installation/construction, and 50% for commissioning/final report. milestone description proposed number: 1 preliminaries, site establishment, supply delivery 20 2 installation and construction works 30 3 commissioning and final report documentation 50
Quotations will be assessed based on mandatory compliance, work health and safety systems, performance, weighted price evaluation, experience, capability, proposed personnel, timeframe, construction methodology, local content, and modern slavery mitigation. quotations will be assessed in accordance with the following criteria: mandatory compliance with the quotation requirements criteria respondents are requested to provide certain information within their submissions and may be asked to adhere to other requirements e. g. attendance at meetings. work health and safety systems and performance weighted price evaluation experience and capability criteria proposed personnel timeframe for completion of the project constructionperformance methodology local content modern slavery mitigation maturity
Contractors must have an appropriate NSW plumbing and drainage contractor licence if water service connections are undertaken, demonstrated competency in water reticulation construction, and current general construction induction white card. appropriate nsw plumbing and drainage contractor licence where water service connections are undertaken. demonstrated competency in the construction of water reticulation infrastructure.
FALSE