East Gippsland Water
**** North Arm Water Main Replacement - The objective of this project to construct a replacement water main on a new alignment, to reduce the risk of failure in the existing main. This project will also upgrade the pipe size to cater to future growth, and increase network resilience. The proposed works include installation of new DN375mm ( OD450), HDPE PE100, PN16 water main. The existing DN225mm ( OD315) pipeline being retained is proposed to remain in place, to be used as a contingency asset. The Scope of
Tender Close Date: