Midcoast Council seeks an experienced contractor for a five-year, non-exclusive, as-required contract to crush, grind, screen, and process stockpiled concrete, bricks, and tiles at Taree, Gloucester, and Stroud waste management centres. The contractor must produce 20mm, 40mm, and 80mm finished products. Key requirements include providing all personnel, mobile plant, dust suppression, and adhering to strict WHS and environmental controls, including an unexpected asbestos procedure. Standard service requests require commencement within 21 calendar days, and urgent requests within seven calendar days.
For standard service requests, the contractor must commence site establishment within 21 calendar days. For standard service requests, the contractor must commence site establishment within 21 calendar days.
Tendered rates are to be all-inclusive rates per cubic metre of accepted finished product, measured by survey of the finished stockpiles. Tendered rates are to be allinclusive rates per cubic metre of accepted finished product, measured by survey of the finished stockpiles.
The assessment criteria include price and whole-of-life value, service methodology, responsiveness and production capacity, WHS, traffic management and public interface controls, environmental, dust, silica and unexpected asbestos controls, and relevant experience, personnel, plant, quality and business continuity. weighted assessment criteria and mandatory assessment criteria
Mandatory criteria include submission by a legal entity with an ABN, acceptance of response periods, and current insurance coverage. m1 tender submitted by a legal entity with an abn and authority to contract.
Attendance at a briefing does not replace the tenderer's own inspection and due diligence. attendance at a briefing does not replace the tenderersown inspection and due diligence.
The last date for questions is **** at 5pm. last date for questions 5pm, ****
A tender may be excluded if it does not satisfy each mandatory criterion or provide evidence requested in part d. a tender may be excluded if it does not satisfy each mandatory criterion or provide evidence requested inpart d.