Goulburn Valley Water
Raw Water Pipeline Upgrade Ritchie' s To Mansfield Number 3 Construction - All Goulburn Valley Water Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system e. g. AS/NZS ****: **** Brief Scope: The Mansfield Raw Water System Upgrade aims to bolster and secure the raw water supply to the township of Mansfield. The project involves: i) Construction of approximately 9. 6 km long DN560mm HDPE PE100 PN16 pipeline along Delatite Lane, Mansfield-
Raw water pipeline upgrade i Construction of approximately 9. 6 km long dn560mm hdpe pe100 pn16 pipeline along delatite lane, mansfieldwoods point road, ogilvies road and highton lane. ii the design and construction of a water transfer pump station at ritchies reservoir no. 2 located on delatite lane. including the design and construction of a 5kl surge vessel. iii ancillary work: a. cap the existing raw water supply at an agreed location prior to its crossing ogilvies road, b. demolish and remove an abandoned tank and pump station approximately located at chainage **** drawing ****
Tender Close Date: