Department Of Logistics And Infrastructure
Alice Springs Region - Sandover Highway - Upgrade to Seal Standard 170 to 182 km - Upgrade and seal of the Sandover Highway from 170 km to 182 km. The upgrade is to establish a 9. 0m wide two- lane sealed carriageway on a 9 m wide formation within the extents of the current road alignment. The length of works consists of 1 two cell culvert, 5 floodways ( All spray- sealed), 2 intersections, and the replacement of one existing cattle grid with a new cattle grid, including approach slabs, rails and width mark
Tender Close Date: