CQURFQ- 26- 13- DFM - MKY080 Workshop Extension - CQUniversity Australia requires the design and construction of an extension to the existing undercover workshop canopy located at the Mackay Ooralea Campus. The works comprise the extension of the existing lean- to canopy along the western facade of the workshop building between structural gridlines C1 and C8, integrating with the existing structure to form a continuous undercover work area. The Contractor shall undertake the design, supply, construction and
AI helper
CQUniversity Australia is seeking tenders for the design and construction of an extension to an existing undercover workshop canopy at the Mackay Ooralea Campus. The project involves extending a lean-to canopy along the western facade of the workshop building, integrating it with the existing structure. The contractor will be responsible for the design, supply, construction, and certification of the canopy extension, adhering to the National Construction Code, relevant Australian Standards, and CQUniversity's design requirements. Key aspects include structural design, engineering certification, footings, roofing, electrical works, fencing, CCTV, and signage. A mandatory site visit is scheduled for March 27, 2026, with bookings closing on March 26, 2026. The closing date for submissions is April 13, 2026. The contract award is expected on April 20, 2026, with work commencement on June 1, 2026, and practical completion by September 30, 2026. Suppliers must submit their offers in PDF format and are encouraged to conduct a site inspection prior to submission. CQUniversity's standard payment terms are net 30 days.
The practical completion deadline for the works is ****.
CQUniversity's standard payment terms are net30 invoices for the total amount, invoiced upon acceptance of the goods andor services by CQU.
The contractor is required to provide a twelve 12 months maintenance and warranty of the equipment at no further cost commencing from practical completion.
The award criterion includes relevant experience delivering similar projects (25%), methodology and construction approach (20%), program and ability to deliver within required timeframe (10%), and price (40%).
To be a conforming offer, the offer must be received by the closing date and time, be received in the specified format and method, be open for the minimum offer validity period, satisfy all mandatory requirements, respond to all sections of schedules 5, 6 and 7, and review any associated documents referred to in the contract details.
A mandatory site visit is scheduled for **** at **** Boundary Road, Ooralea, QLD, **** of bookings for the mandatory site visit is ****, 2:00 pm.
Supplier query cutoff is Wednesday 15 April 2026 01:00 am E. South America Standard Time.