Public Transport Authority
Picton Yard Modification Works for New Australind Train - - Scope of Works Under the proposed Contract, the PTA will require the Contractor to carry out all Works for the required modifications to Picton Yard as detailed within the Design Documents and including ( but not limited to) the following: o Location markers: Provide visible fuelling road location markers to enable drivers to align each Australind railcar with the refuelling bench and AdBlue ( Diesel Exhaust Fluid & ndash; DEF) point as required, a
Tender Close Date: