Loddon Shire Council
Civil Engineering
C665 Laanecoorie Newbridge Rd Reconstruction2025- 2026 - The project is to reconstruct the section of Laanecoorie- Newbridge Road ( 6. 84km - 8. 12km) as detailed in drawings **** - ****2 and including all standard drawing details and specifications. Note: The working zone of the road is from verge to verge except where trees are in or very near the verge then working zone is shoulder to shoulder. The Pipe/Box culverts need to be blended smoothly with the existing table drain.
Reconstruction of Laanecoorie- Newbridge Road
Tender Close Date: