Barwon Water
**** Portarlington Rising Main Package Two - Pipeline Extension, Pump Station and Vortex Drop - Upgrades to the Portarlington Rising Main Sewer Network aimed at reducing odour emissions at the Portarlington Water Reclamation Plant and increasing operational security by upgrading aging assets. Works Include: Upgrades /Refurbishment of the existing sewage pumping station including wet well, switchboards, discharge valving arrangement and ventilation infrastructure. Replacement of the existing rising mains.
Portarlington Rising Main Package Two Pipeline Extension, Pump Station and Vortex Drop Upgrades refurbishment of the existing sewage pumping station including wet well, switchboards, discharge valving arrangement and ventilation infrastructure. Replacement of the existing rising mains. Upgrade of the existing inlet works system to include a barometric loop and above ground. Provision of a bypass of the proposed above ground vortex drop structure.
Tender Close Date: