The principal seeks a contractor for the design and construction of a floating jetty at Batavia Quays boat ramp and upgrade works. The scope includes demolition of the existing boat ramp and northern abutment, and construction of a new ramp, abutment, floating jetty, mooring, and connecting gangway/path. The tender is split into two separable portions (A: boat ramp replacement/abutment; B: floating jetty fabrication/installation). Tenders must be lodged electronically via vendorpanel by 2:00 pm AWST on Wednesday, August 19, 2026. The project must achieve practical completion by April 30, 2027. The contract is a lump sum fixed price, not subject to rise and fall in costs. Warranty guarantees are for 12 months.
Tender submissions close at 2:00 pm AWST on Wednesday, August 19, 2026. tender submissions close: 2. 00pm awst on wednesday 19 august 2026
Progress claims are submitted monthly for work completed on site in the previous month, processed within 7 days of receipt, with payment within a further 7 days of superintendent's authorisation. claims will only be considered for items fixed on site and will not include items or materials that are not fixed at the time of the claim.
All work under the contract shall be guaranteed against faulty workmanship and/or materials for a period of 12 months. all work under the contract shall be guaranteed against faulty workmanship and/or materials for a period of 12 months.
The most advantageous tender will be awarded, assessed against price consideration, regional price preference, compliance, and qualitative criteria. a contract may be awarded to the tenderer whose tender is considered the most advantageous to the principal.
Tenderers must demonstrate successful experience in similar projects, outline capacity, and provide relevant OH&S documentation. complete form 1 showing a minimum of 3 examples of relevant projects.
The document does not specify penalties, but failure to meet hold points may result in rectification at the contractor's expense. failure to gain approvals at these holdpoints may result in rectification of substantial amounts of work at the contractors expense.
Contractors are deemed to have visited the site to determine the nature of the work and made due allowance for existing site conditions. the contractor is deemed to have visited the site to determine the nature of the work and to verify and made due allowance for the following conditions:
Where required by specification, the contractor must provide samples of proposed work and gain approval from the site superintendent prior to proceeding. where required by the specification the contractor is to provide samples of proposed work and gain approval from the site superintendent prior to proceeding,
Requests for clarification must be posted on the vendorpanel online forum prior to Wednesday, August 12, 2026. requests for clarification regarding this request must be posted on the vendorpanel online forum prior to wednesday 12 august 2026.
Tenders may be rejected if incomplete, fail to comply with requirements, or if the tenderer canvasses principal officers. a tender will be rejected without consideration of its merits in the event that: a it is not submitted before the deadline or b it is not submitted at the place specified within the request or c it may be rejected if it fails to comply with any other requirements of the request.