The Department for Education, Children and Young People seeks expressions of interest for a lead design consultant for the major redevelopment of Deloraine High School. This is the first stage of a two-stage procurement process. Responses must be lodged by 2:00 pm Hobart time on Wednesday, September 2, 2026. Prequalification requires architecture consultants with a project cost of $16,500,000 or above. An industry briefing session is scheduled for Thursday, August 13, 2026, at 10:30 am onsite at Deloraine High School.
A response must be lodged on or before 2:00pm Hobart time on Wednesday, 2 September 2026. closing time for lodging a response: a response must be lodged, in accordance with this reoi, on or before 2. 00pm hobart time on wednesday, 2 september 2026
For the EOI stage, responses will be evaluated against criteria including design quality, expertise and experience (35%), capability, resourcing and capacity (35%), and economic and social benefits statement (30%). responses will be evaluated against the following evaluation criteria
Respondents must be prequalified with the Department of Treasury and Finance architecture up to or above a project cost of $16,500,000. only respondents prequalified with the department of treasury and finance architecture up to or above a project cost of 16, 500, **** are eligible to respond to this reoi
A respondent must not inspect a site or sites relevant to project except in accordance with a site inspection site inspection arranged by the potential respondent with the contact officer. a respondent must not inspect a site or sites relevant to project except in accordance with a site inspection site inspection arranged by the potential respondent with the contact officer.
A response may be excluded if the respondent has breached a provision of this reoi, and that breach, in the opinion of the principal, has materially and adversely affected the integrity of the reoi process. a response may be excluded from the reoi evaluation process if there is evidence that the respondent lodging that response: has breached a provision of this reoi, and that breach, in the opinion of the principal, has materially and adversely affected the integrity of the reoi process