The principal seeks a contractor for the design and construction of a floating jetty and upgrade works at Batavia Quays boat ramp. The scope includes demolition of the existing boat ramp and northern abutment, and construction of a new ramp, abutment, floating jetty, mooring, and connecting gangway/path. The tender is split into two separable portions (A: boat ramp replacement; B: floating jetty). Tenders must be lodged electronically via vendorpanel by 2:00 pm AWST on Wednesday, August 19, 2026. The project must achieve practical completion by April 30, 2027. The contract is a lump sum fixed price, not subject to rise and fall adjustments. Evaluation considers price, regional preference, compliance, and qualitative criteria.
Tender submissions close at 2:00pm AWST on Wednesday, August 19, 2026. tender submissions close: 2. 00pm awst on wednesday 19 august 2026
Progress claims are submitted monthly for work completed on site in the previous month, processed within 7 days of receipt, with payment within a further 7 days of superintendent's authorisation. claims will only be considered for items fixed on site and will not include items or materials that are not fixed at the time of the claim.
All work is guaranteed against faulty workmanship or materials for a period of 12 months. all work under the contract shall be guaranteed against faulty workmanship and or materials for a period of 12 months.
The contract may be awarded to the tenderer whose tender is considered the most advantageous to the principal, assessed using price, regional preference, compliance, and qualitative criteria. a contract may be awarded to the tenderer whose tender is considered the most advantageous to the principal.
Tenderers must demonstrate successful experience in similar projects, outline capacity, and provide relevant OH&S documentation. complete form 1 showing a minimum of 3 examples of relevant projects.
The contractor is deemed to have visited the site to determine the nature of the work and to verify site conditions. the contractor is deemed to have visited the site to determine the nature of the work and to verify and made due allowance for the following conditions:
Where required by specification, the contractor must provide samples of proposed work and gain approval from the site superintendent prior to proceeding. where required by the specification the contractor is to provide samples of proposed work and gain approval from the site superintendent prior to proceeding
Requests for clarification must be posted on the vendorpanel online forum prior to Wednesday, August 12, 2026. requests for clarification regarding this request must be posted on the vendorpanel online forum prior to wednesday 12 august 2026.
Tenders may be rejected if they are not submitted before the deadline, not submitted at the specified place, or fail to comply with any other requirements. a tender will be rejected without consideration of its merits in the event that: a it is not submitted before the deadline or b it is not submitted at the place specified within the request or c it may be rejected if it fails to comply with any other requirements of the request.
Tenderers must complete the contractor pre-qualification work health and safety questionnaire. tick if attached please attach a copy of the completed contractor pre qualification qualification work health and safety questionnaire, occupational safety available in form 3 of this tender.