Department Of Logistics And Infrastructure
Alice Springs Correctional Centre - Provision of Kitchen Evaporative Air Conditioning Duct Replacement - Mandatory Site Inspection Replacement of Evaporative Air Condition Ductwork and associated works at Alice Springs Correction Centre Kitchen, including but not limited to:
provide gasketed cover plates of the same material as the duct. set system into normal operation. mark up asbuilt documentation with the position of the index run. the index outlet for each system should be identified and checked to see that this matches the expected location, to provide a crosscheck for leaks or compression of ducts, which would case balancing problems. manufacturers recommended commissioning proceduresrequirement: if manufacturers provide commissioning procedures, commission to those recommendations subject to the following: instrumentation: conform to the performance and calibration requirements in the instrumentation clause in this worksection for the variable measured. tolerances on measured values: within the limits documented. handoverrequirement: following completion of construction of the works including commissioning and testing, rectification of defects, documentation of the as installed works, and documentation of the ongoing maintenance and management of the works during the cour
Tender Close Date: