Department For Energy And Mining
Central Powerhouse ( CPH) Generator Replacement Project Design Stage- The CPH power station is part of the Remote Area Energy Supply ( RAES) scheme, which serves five major communities through a 300km, 33kV distribution network. The project addresses two primary operational challenges: - The existing ( aged) four Caterpillar **** generators have a minimum load capacity of 40%, which limits the integration of renewable energy sources and increases fuel consumption. - The Main Switchboard' s ( MSB) fault curr