N Shire Of Wilunan
Road Resurfacing
Wiluna North Road Resilience Project Reformation and Road Seal 4kms - The Shire of Wiluna is looking for experienced Contractors to reform, resheet and seal 4 kms of the Wiluna North Road, commencing from the end of the existing bitumen sealed road at SLK 9. 62. The Shire is looking to engage a Contractor by mid June 2026
Wiluna North Road Resilience Project The Wiluna North Road Resilience Project ( WNR Project) will cover areas from SLK 8. 95 to SLK ****. There will be 4 main focus areas components for the project work: 1. Strategic hydrological assessment: and tactical flood attenuation measures SLK 8. 52 to SLK **** a. Simple local flood modelling to establish flood flow regimes for multiple and/or broad floodways b. Design and set out of simple but tactical flood attenuation, erosion sediment control measures. 2. Floodway stabilisation: including with cement, rock facing armouring keyed in, erosion and sedimentation controls and reshaping of runoff channels tied in to finished levels of roadside spoon drains SLK 8. 95 to SLK 9. 62 existing sealed section, 3. Implementation of civil works: covering road reformation, resheeting, floodway stabilisation including with cement, rock facing armouring keyed in, erosion and sedimentation controls and reshaping of runoff channels tied in to finished levels of roadside spoon dr
Tender Close Date: