N City Of Ballaratn
Stage Lift/ Platform Lift/ Building Maintenance/ Maintenance Services
25/26- 305 Buninyong Town Hall - DDA Compliant Access - - Replace handrails on front steps with compliant steel handrails. The historic photographs confirm the existing steel pipe handrails are not original. As built there were no handrails but these are required to allow the continued use of the front stairs. - Remove concrete gate posts to widen entrance to path. These posts appear to date from the **** or later, probably contemporary with the concrete addition to the Town Hall. - Remove existing asphal
Accessibility works at Buninyong Town Hall Replace handrails, remove concrete gate posts, remove asphalt path, construct pergola, widen door openings, install new doors, new awning roof, internal wall removal, stage lift installation, platform lift installation
Tender Close Date: