Flooring upgrade at Lot 68 New Village Street, Mabuiag. Quotation must be submitted via Vendor Panel or email by 13 November 2026 at 2pm. Lump sum price breakdown schedule must be completed; amendments render RFQ non-conforming. Award based on best value for money, with price and non-price criteria assessed. Quotation validity 90 days. Payment on completion, with progress claims considered. Defect liability period 12 months. Public liability insurance of $20,000,000 required. Contractor must obtain permits for entering Torres Strait community and comply with all local regulations.
Quotations must be lodged by 13 November 2026 at 2pm. The RFQ states: close date: 13th november 2026 @2pm.
Payment is made within 30 days of receiving a valid tax invoice. The document states: the contractor will be paid by tsirc within 30 days of receiving a valid tax invoice.
The contractor warrants the works are free from defects, comply with standards, and are fit for purpose. The document states: be free from any charge, liability or defect comply with all applicable standards be fit for purpose.
The award is based on best value for money. The document states: the engagement of services shall be awarded to the respondent who best demonstrates the ability to provide best value for money.
All work must be carried out by experienced and licensed personnel. The document states: all work must be carried out by experienced and licensed personnel in the field of work specified.
If works are not completed within the requested timeframe, TSIRC may remove the work order. The document states: tsirc nominated representatives have the authority to remove the system work order from the contractor.
If the lump sum price breakdown schedule is amended, the RFQ will be non-conforming. The document states: if the line breakdowns for the 7. 3 lump sum price breakdown schedule have been amended the rfq will be classed as non-conforming.