N City Of Ballaratn
Platform Lift/ Building Construction Materials Services
25/26- 305 Buninyong Town Hall - DDA Compliant Access - - Replace handrails on front steps with compliant steel handrails. The historic photographs confirm the existing steel pipe handrails are not original. As built there were no handrails but these are required to allow the continued use of the front stairs. - Remove concrete gate posts to widen entrance to path. These posts appear to date from the **** or later, probably contemporary with the concrete addition to the Town Hall. - Remove existing asphal
DDA compliant access upgrades to Buninyong Town Hall including replacement of handrails, removal of concrete gate posts, new walkway, pergola, accessible door, internal wall removal, door changes, and platform lift installation Replacement of handrails on front steps with compliant steel handrails, removal of concrete gate posts, removal of existing asphalt path and rock edging, new walkway to **** compliant gradients, new pergola over walkway section, removal of existing side door and installation of wider accessible door, new steel framed awning roof, internal wall removal to form new lobby space, changes to doors D5, D6, D7, D8, alteration to servery opening, demolition of west steps to stage, widening door D3 opening, installation of platform lift
Tender Close Date: