EOI for design, supply, and turnkey construction of residential dwellings and duplexes in Bedourie, Queensland. Stage 1 market-sounding. Submissions due 5:00pm on 8 October 2026 via Vendor Panel. Evaluation criteria: experience and capability (30%), suitability of proposed options (30%), deliverability program (20%), and turnkey cost understanding (20%). Respondents must provide indicative full turnkey costs exclusive of GST for single and multiple purchases up to three dwellings. Sample concept designs required. Remote location considerations include freight, transport, and seasonal access.
Expressions of interest must be uploaded to vendor panel by no later than 5:00pm on 8 October 2026. expressions of interest must be uploaded to vendor panel by no later than 5:00pm on 8 october 2026
Turnkey includes defectswarranty period as part of compliance and handover. defectswarranty period, handover and documentation manuals, asbuilts, certificates
Evaluation criteria include experience, capability, and capacity to deliver incl. remote delivery 30, suitability and quality of the proposed options for bedourie 30, deliverability program, lead times and ability to meet timeframes 20, and value indicated by the turnkey cost understanding of full cost 20.
Respondents must be suitably experienced and capable to present options for design, supply, delivery, and turnkey construction. invites expressions of interest eoi from suitably experienced and capable respondents
Site inspection is marked as not applicable in the briefing details. briefing or site inspection: details maximum attendees mandatory rsvp not applicable not applicable yes x no not applicable
Sample concept designs are required as part of the EOI response. samples sample concept designs that the costings have been based off
Communications regarding the procurement process must be uploaded to vendor panel no later than three calendar days prior to the submission time. communications regarding the procurement process must be uploaded to vendor panel no later than three 3 calendar days prior to the time stated in item 4