N City Of Ballaratn
Community Benefit/ Community Benefit Plan
26/27- 58 Ballarat Connections - Trail Works Whitelaw Avenue - This project includes the construction of a shared path as part of the broader Ballarat Connections trail. The project provides a shared path link alongside Whitelaw Avenue between Doug Dean Reserve and Sutton Street. Links back into the adjacent footpath network and south into Doug Dean Reserve are is also included. The combined length of the proposed path connections is just over **** and includes five shared user raised pedestrian crossings
shared path construction site establishment, demolition, solar lighting, minor roadworks, asphalt works, concrete footpath and kerb construction, car park extension, ramps, shared user raised pedestrian crossings, drainage swales, graded drainage channel, side entry pits modification, kerb inlets, driveway crossover, tree protection, landscape work, tree planting, post and rail fencing, vehicle barriers, bollards, directional signage, road signage, seating, landscape establishment and maintenance
Tender Close Date: