Knox City Council
Valve Replacement
The required scope of work is separated into two stages and is summarised as follows; Compulsory site attendance is required on site at 11am 30th September. Please refer to Part 1 Special Conditions for details. Stage 1 Work Items ( Internal) o Pool Painting. Existing 50m pool and Program pool to be re- painted. o Pool Tiling. Pool tiling cleaning, repairs and tiling 50m pool ramp wall. o Pool Handrails. The existing handrail servicing the 50m pool ramp shall be replaced. o Pool Water Features. Water featur
Pool maintenance and upgrades Pool painting, pool tiling, pool handrails replacement, water features cleaning and maintenance, pool concourse finishes regrading and replacement, water slide repair, valve replacement, truck bund construction, water slide section cleaning and painting
Tender Close Date: