N Kempsey Shire Counciln
Provision of Power Supply for Stuarts Point Sewer Scheme - Kempsey Shire Council is seeking submission from appropriately qualified and experienced suppliers for the design, supply and installation of permanent power supplies for the Stuarts Point STP, Fishermans Reach Flushing Station and Grassy Head Pump Station. Council has prepared preliminary concept designs and load calculations for each site. Construction works on the Stuarts Point STP are scheduled to commence in February 2027. Temporary power suppl
Design, supply and installation of permanent power supplies for Stuarts Point Sewer Scheme Design and installation of 500kVA substation, high voltage conductor cable **** AAAC, nonstandard 63A HV fuses, 630A LV fuse switch, protection setting review, recloser setting uplift, connection to 11, 000V distribution network at asset ****