N Whitsunday Regional Counciln
**** Mullers Lagoon - Stage 1 Foothpath Construction - Whitsunday Regional Council ( Principal) is seeking a suitably experienced, qualified and appropriately licensed Contractor to construct the first stage of the Mullers Lagoon Masterplan footpath network ( Works) at Mullers Lagoon, The Soldiers Road, Bowen ( Site). The Works comprise of the construction of the marked footpath alignment shown on the tender drawings ( Appendix A), generally following the lagoon perimeter and island loop. The primary pa
Construction of stage 1 of the Mullers Lagoon masterplan footpath network, including a 2. 5 m wide cycle- pedestrian concrete path. Construction of reinforced concrete footpaths, joints and transitions; earthworks, subgrade preparation, fill and bedding; protection of existing irrigation pipework with pipe envelopers; supply and installation of park benches and curved footpath steps; neat tie- ins at existing paths and bridge approaches; erosion, sediment, dust, noise, waste and spill controls; reinstatement of disturbed verges, landscaping, drainage and adjoining assets; testing, quality records, as- constructed information, completion cleaning and handover.
Tender Close Date: