South Gippsland Water
Reticulation Network
Poowong Booster Pump Station - This project objectives are to fix issues around water pressure within the townships reticulation water system by installing a booster pump station on the outlet of the Poowong water tower. The new pump station will increase pressure reliability for customers within the Poowong reticulation network and allow the water tank to be operated at lower levels.
Installation of a booster pump station on the outlet of the Poowong water tower to fix water pressure issues in the township reticulation system Booster pump station installation, water reticulation system improvements, pressure reliability enhancement
Tender Close Date: