N Monadelphousn
Piping
( Granulated) Activated Carbon Filter Supply - Brigalow Peaking Power Plant Project BOP Construction - EXPRESSION OF INTEREST SORT FOR THE SUPPLY OF ACTIVATED CARBON FILTER Monadelphous is currently undertaking the construction of the greenfield Brigalow Peaking Power Plant ( PPP), a gas- fired power station being delivered for CS Energy. As part of this project, we require the supply of an Activated Carbon Filter Please reply to this expression of interest with your capability and desire to go onto a tende
Activated carbon filter supply One 1 x 100 activated carbon filter type: vertical with activated carbon media, internals complete with associated inlet, outlet valves, fittings, instruments etc. Design capacity 30 m3hr supporting structure, ladders, access hatch etc for easy maintenance. The package shall be associated with piping including inlet, outlet, vent, backwash connection piping along with associated valves within the package. One 1 rotameter at the inlet piping of the package. One 1 media trap at the outlet piping of the package. Two 2 sight glasses. Online backwash arrangement with required valves. Differential pressure indicator cum transmitter across the inlet and outlet. Lifting lugs. Base frames. Pipe supports. Manhole and access hatch arrangement for maintenance requirements. SS nameplates KKS tagging. Startup and commissioning spares and consumables. All special tools required for installation operation and maintenance. Companion flange for piping along with gasket and fasteners.
Tender Close Date: