Public Transport Authority
Temporary Works
Design & Construct - Rail Bridge Walkway Improvements - Fremantle and Canning Stokely - - Background The Public Transport Authority ( PTA) of Western Australia requires to address identified safety and access risks associated with inspection and maintenance activities on railway bridge assets. The majority of existing bridge configurations occupy the full width of the structure, providing limited or no refuge space for maintenance personnel during train operations. This presents a significant safety risk to
Design and construct rail bridge walkway improvements for Fremantle and Stokely railway bridges Design, supply, installation, testing, commissioning, and handover of new maintenance barrier walkways; associated civil, structural, safety, earthing and bonding, access provisions, and temporary works; steel walkway structures, handrails, anti- climb systems, signage, line marking, static line- fall arrest systems; earthing and bonding systems; modifications to ground levels, abutments, ramps, and earth- retaining structures
Tender Close Date: